RNS - move load to new substation (1311)
RNS - move load to new substation is a 20.0 MW generation interconnection project in Plymouth, Massachusetts with a current status of active. It is proposed to connect at Wareham Street to new South Middleborough Substation.
20.0 MWCapacity
ActiveStatus
SEMAMarket
GenerationTechnology
Project facts
| Canonical name | RNS - move load to new substation |
|---|---|
| Queue ID | 1311 |
| Status | active |
| Source status | A |
| Market | SEMA |
| Technology | Generation |
| Capacity | 20.0 MW |
| State | Massachusetts |
| County | Plymouth |
| Point of interconnection | Wareham Street to new South Middleborough Substation |
| Requested (queue) date | 2022-09-23 |
| Proposed in-service date | 2026-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.