Roadrunner Crossing Wind SLF (19INR0117)

Roadrunner Crossing Wind SLF is a 128.0 MW wind+battery interconnection project in Eastland, Texas with a current status of operational. It is proposed to connect at 68051 Reata 345kV.

128.0 MWCapacity
OperationalStatus
ERCOTMarket
Wind+BatteryTechnology

Project facts

Canonical nameRoadrunner Crossing Wind SLF
Queue ID19INR0117
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind+Battery
Capacity128.0 MW
StateTexas
CountyEastland
Point of interconnection68051 Reata 345kV
Requested (queue) date2017-09-07
Proposed in-service date2025-07-30
Operational date2024-04-18
Withdrawn date
DeveloperRoadrunner Crossing Wind Farm, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.