Roboman Solar (27INR0453)

Roboman Solar is a 272.6 MW solar interconnection project in Coke, Texas with a current status of operational. It is proposed to connect at Tap 345 kV (#76009) Twin Buttes – (#76090) Divide Ckt 1.

272.6 MWCapacity
OperationalStatus
CokeMarket
SolarTechnology

Project facts

Canonical nameRoboman Solar
Queue ID27INR0453
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCoke
TechnologySolar
Capacity272.6 MW
StateTexas
CountyCoke
Point of interconnectionTap 345 kV (#76009) Twin Buttes – (#76090) Divide Ckt 1
Requested (queue) date2025-07-07
Proposed in-service date
Operational date2029-07-01
Withdrawn date
DeveloperRoboman Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.