Rochester 161kV (A) to Adams 161kV (B) (J2861)
Rochester 161kV (A) to Adams 161kV (B) is a 147.0 MW solar interconnection project in Mower, Minnesota with a current status of operational. It is proposed to connect at Rochester 161kV (A) to Adams 161kV (B).
147.0 MWCapacity
OperationalStatus
—Market
SolarTechnology
Project facts
| Canonical name | Rochester 161kV (A) to Adams 161kV (B) |
|---|---|
| Queue ID | J2861 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Solar |
| Capacity | 147.0 MW |
| State | Minnesota |
| County | Mower |
| Point of interconnection | Rochester 161kV (A) to Adams 161kV (B) |
| Requested (queue) date | 2022-09-13 |
| Proposed in-service date | 2029-08-31 |
| Operational date | 2029-08-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | DAIRYLAND POWER COOPERATIVE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.