ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV (J4104)

ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV is a 250.0 MW battery interconnection project in Houston, Texas with a current status of withdrawn. It is proposed to connect at ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameROCKY CREEK - CROCKETT (SWEPCO) 345.0kV
Queue IDJ4104
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyHouston
Point of interconnectionROCKY CREEK - CROCKETT (SWEPCO) 345.0kV
Requested (queue) date2025-10-06
Proposed in-service date2030-06-30
Operational date2030-06-30
Withdrawn date2025-12-19
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata