Rocky River (CT) (539_2)

Rocky River (CT) is a 3.5 MW battery interconnection project in Litchfield, Connecticut with a current status of operational.

3.5 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameRocky River (CT)
Queue ID539_2
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity3.5 MW
StateConnecticut
CountyLitchfield
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1928-01-01
Withdrawn date—
Developer—
Utility / transmission ownerFirstLight Power Resources Services LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata