FirstLight Power Resources Services LLC — Interconnection Queue Projects
FirstLight Power Resources Services LLC is associated with 26 tracked interconnection projects representing 139 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
26Projects
0Active
26Operational
0Withdrawn
139 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 23 | 108 MW |
| Battery | 3 | 31 MW |
Geographic footprint
| State | Projects |
|---|---|
| Connecticut | 26 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Shepaug | 552_1 | Other | 37.2 MW | operational | New Haven, Connecticut |
| Rocky River (CT) | 539_3 | Battery | 24.0 MW | operational | Litchfield, Connecticut |
| Tunnel | 557_10 | Other | 18.5 MW | operational | New London, Connecticut |
| Stevenson | 553_4 | Other | 8.0 MW | operational | Fairfield, Connecticut |
| Stevenson | 553_2 | Other | 7.5 MW | operational | Fairfield, Connecticut |
| Stevenson | 553_1 | Other | 7.5 MW | operational | Fairfield, Connecticut |
| Stevenson | 553_3 | Other | 7.5 MW | operational | Fairfield, Connecticut |
| Rocky River (CT) | 539_2 | Battery | 3.5 MW | operational | Litchfield, Connecticut |
| Rocky River (CT) | 539_1 | Battery | 3.5 MW | operational | Litchfield, Connecticut |
| Falls Village | 560_2 | Other | 3.0 MW | operational | Litchfield, Connecticut |
| Falls Village | 560_3 | Other | 3.0 MW | operational | Litchfield, Connecticut |
| Falls Village | 560_1 | Other | 3.0 MW | operational | Litchfield, Connecticut |
| Scotland Dam | 551_1 | Other | 2.0 MW | operational | Windham, Connecticut |
| Bulls Bridge | 541_6 | Other | 1.2 MW | operational | Litchfield, Connecticut |
| Bulls Bridge | 541_2 | Other | 1.2 MW | operational | Litchfield, Connecticut |
| Bulls Bridge | 541_1 | Other | 1.2 MW | operational | Litchfield, Connecticut |
| Bulls Bridge | 541_4 | Other | 1.2 MW | operational | Litchfield, Connecticut |
| Bulls Bridge | 541_3 | Other | 1.2 MW | operational | Litchfield, Connecticut |
| Bulls Bridge | 541_5 | Other | 1.2 MW | operational | Litchfield, Connecticut |
| Tunnel | 557_2 | Other | 1.0 MW | operational | New London, Connecticut |
| Tunnel | 557_1 | Other | 1.0 MW | operational | New London, Connecticut |
| Taftville | 554_1 | Other | 0.4 MW | operational | New London, Connecticut |
| Taftville | 554_5 | Other | 0.3 MW | operational | New London, Connecticut |
| Taftville | 554_4 | Other | 0.3 MW | operational | New London, Connecticut |
| Taftville | 554_3 | Other | 0.3 MW | operational | New London, Connecticut |
| Taftville | 554_2 | Other | 0.3 MW | operational | New London, Connecticut |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through FirstLight Power Resources Services LLC.
Start tracking with interXdata