Rollin Schahfer - Lake George 345kV Line (J1332)

Rollin Schahfer - Lake George 345kV Line is a 200.0 MW solar interconnection project in Jasper County, Indiana with a current status of withdrawn. It is proposed to connect at Rollin Schahfer - Lake George 345kV Line.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRollin Schahfer - Lake George 345kV Line
Queue IDJ1332
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateIndiana
CountyJasper County
Point of interconnectionRollin Schahfer - Lake George 345kV Line
Requested (queue) date2019-04-29
Proposed in-service date2022-04-20
Operational date2022-04-20
Withdrawn date2024-03-08
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata