Rolling Upland Wind Farm (C24-322)

Rolling Upland Wind Farm is a 79.8 MW wind interconnection project in Madison, New York with a current status of withdrawn. It is proposed to connect at County Line-Brothertown 115kV.

79.8 MWCapacity
WithdrawnStatus
NYISOMarket
WindTechnology

Project facts

Canonical nameRolling Upland Wind Farm
Queue IDC24-322
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyWind
Capacity79.8 MW
StateNew York
CountyMadison
Point of interconnectionCounty Line-Brothertown 115kV
Requested (queue) date2024-10-07
Proposed in-service date
Operational date
Withdrawn date
DeveloperRolling Upland Wind Farm LLC
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata