Roost Energy Storage (24INR0519)

Roost Energy Storage is a 102.4 MW other interconnection project in Scurry, Texas with a current status of operational. It is proposed to connect at KNDRSACRC Bus #11130 to Knapp Substation Bus #1310.

102.4 MWCapacity
OperationalStatus
ScurryMarket
OtherTechnology

Project facts

Canonical nameRoost Energy Storage
Queue ID24INR0519
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketScurry
TechnologyOther
Capacity102.4 MW
StateTexas
CountyScurry
Point of interconnectionKNDRSACRC Bus #11130 to Knapp Substation Bus #1310
Requested (queue) date2023-01-30
Proposed in-service date
Operational date2028-09-30
Withdrawn date
DeveloperBluff Creek Energy Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata