Roost Energy Storage (24INR0519)

Roost Energy Storage is a 102.4 MW other interconnection project in Scurry, Texas with a current status of operational. It is proposed to connect at the Knapp Sub (bus# 1310) – Union Switch (bus# 18555).

102.4 MWCapacity
OperationalStatus
ScurryMarket
OtherTechnology

Project facts

Canonical nameRoost Energy Storage
Queue ID24INR0519
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketScurry
TechnologyOther
Capacity102.4 MW
StateTexas
CountyScurry
Point of interconnectionthe Knapp Sub (bus# 1310) – Union Switch (bus# 18555)
Requested (queue) date2023-01-30
Proposed in-service date—
Operational date2028-09-30
Withdrawn date—
DeveloperBluff Creek Energy Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31poi_nameKNDRSACRC Bus #11130 to Knapp Substation Bus #1310the Knapp Sub (bus# 1310) – Union Switch (bus# 18555)low
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.