Rosemont ring-bus station 115kv substation is a 116.0 MW wind interconnection project in Webster, Nebraska with a current status of withdrawn. It is proposed to connect at Rosemont ring-bus station 115kv substation.

116.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameRosemont ring-bus station 115kv substation
Queue IDGEN-2016-064
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity116.0 MW
StateNebraska
CountyWebster
Point of interconnectionRosemont ring-bus station 115kv substation
Requested (queue) date2016-03-30
Proposed in-service date
Operational date
Withdrawn date2017-09-19
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata