Running Iron Solar (26INR0258)

Running Iron Solar is a 204.7 MW solar interconnection project in Matagorda, Texas with a current status of operational. It is proposed to connect at Tap 138kV Conoco 8138 - Black Cat 80124.

204.7 MWCapacity
OperationalStatus
MatagordaMarket
SolarTechnology

Project facts

Canonical nameRunning Iron Solar
Queue ID26INR0258
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMatagorda
TechnologySolar
Capacity204.7 MW
StateTexas
CountyMatagorda
Point of interconnectionTap 138kV Conoco 8138 - Black Cat 80124
Requested (queue) date2023-10-25
Proposed in-service date
Operational date2028-10-16
Withdrawn date
DeveloperRunning Iron Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata