RYE CO-CYPRESS 138 kV (J3194)

RYE CO-CYPRESS 138 kV is a 198.0 MW solar interconnection project in Hardin, Texas with a current status of withdrawn. It is proposed to connect at RYE CO-CYPRESS 138 kV.

198.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRYE CO-CYPRESS 138 kV
Queue IDJ3194
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity198.0 MW
StateTexas
CountyHardin
Point of interconnectionRYE CO-CYPRESS 138 kV
Requested (queue) date2022-09-15
Proposed in-service date2025-10-31
Operational date2025-10-31
Withdrawn date2023-02-27
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.