Saddle Horn Station BESS SLF (27INR0350)
Saddle Horn Station BESS SLF is a 177.4 MW battery interconnection project in Comanche, Texas with a current status of suspended.
177.4 MWCapacity
SuspendedStatus
ComancheMarket
BatteryTechnology
Project facts
| Canonical name | Saddle Horn Station BESS SLF |
|---|---|
| Queue ID | 27INR0350 |
| Status | suspended |
| Source status | — |
| Market | Comanche |
| Technology | Battery |
| Capacity | 177.4 MW |
| State | Texas |
| County | Comanche |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | developer | Saddle Horn Station BESS LLC | — | low |
| 2026-10-30 | poi_name | tap 138kV 1650 COMANCHE_T8 - 290SHILOHC | — | low |
| 2026-10-30 | phase | SS Completed, FIS Completed, No IA | — | low |
| 2026-10-30 | operational_date | 2028-09-11 | — | medium |
| 2026-10-30 | status | operational | suspended | high |
| 2026-08-31 | phase | SS Completed, FIS Started, No IA | SS Completed, FIS Completed, No IA | low |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata