The interXdata warehouse tracks 17 interconnection projects in Comanche, Texas, representing 3,978 MW of requested capacity.
17Total projects
2Active
11Operational
3Withdrawn
3,978 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 7 | 2,060 MW |
| Solar | 8 | 1,513 MW |
| Battery | 1 | 205 MW |
| Wind | 1 | 200 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Comanche BESS | 27INR0365 | Other | 614.4 MW | operational | Comanche, Texas |
| Dragan Solar | 22INR0237 | Solar | 411.0 MW | operational | Comanche, Texas |
| Dragan Storage | 22INR0400 | Other | 408.3 MW | operational | Comanche, Texas |
| Merope BESS | 24INR0157 | Other | 402.4 MW | operational | Comanche, Texas |
| Spectrum Solar | 21INR0217 | Solar | 400.0 MW | withdrawn | Comanche, Texas |
| Crios BESS | 23INR0359 | Other | 205.5 MW | operational | Comanche, Texas |
| BRP Triton BESS | 24INR0111 | Battery | 205.4 MW | active | Comanche, Texas |
| Logans Gap Wind LLC | 59442_1 | Wind | 200.1 MW | operational | Comanche, Texas |
| Saddle Horn Station BESS SLF | 27INR0350 | Other | 177.4 MW | operational | Comanche, Texas |
| Saddle Horn Station Solar SLF | 27INR0351 | Solar | 174.6 MW | operational | Comanche, Texas |
| Darkwood Solar | 27INR0049 | Solar | 150.8 MW | operational | Comanche, Texas |
| Darkwood Solar | 68478_DRK | Solar | 150.7 MW | active | Comanche, Texas |
| Darkwood BESS | 27INR0050 | Other | 150.5 MW | operational | Comanche, Texas |
| Lamkin Solar | 22INR0220 | Solar | 101.5 MW | operational | Comanche, Texas |
| Canyonland Energy Storage | 25INR0562 | Other | 101.2 MW | withdrawn | Comanche, Texas |
| Twin Mountain Solar | 21INR0378 | Solar | 83.9 MW | withdrawn | Comanche, Texas |
| Paolo Sole Gustine Solar | 27INR0515 | Solar | 40.3 MW | suspended | Comanche, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Mustang Creek Solar, LLC | 2 | 301 MW |
| Saddle Horn Station BESS LLC | 2 | 352 MW |
| ENERGOS BESS | 1 | 614 MW |
| BRP Triton BESS LLC | 1 | 205 MW |
| Hecate Comanche Solar LLC | 1 | 411 MW |
| Orion Renewable Resources LLC | 1 | 84 MW |
| Hecate Grid Dragan Storage LLC | 1 | 408 MW |
| IP Spectrum, LLC | 1 | 400 MW |
| BRP Merope BESS LLC | 1 | 402 MW |
| Canyonland Energy Storage, LLC | 1 | 101 MW |
| Commanche Solar, LLC | 1 | 102 MW |
| BRP Crios BESS LLC | 1 | 205 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Comanche County.