Saddle Horn Station Solar SLF (27INR0351)

Saddle Horn Station Solar SLF is a 174.6 MW solar interconnection project in Comanche, Texas with a current status of operational. It is proposed to connect at 1650 COMANCHE_T8 - 290 SHILOHC 138 kV Line.

174.6 MWCapacity
OperationalStatus
ComancheMarket
SolarTechnology

Project facts

Canonical nameSaddle Horn Station Solar SLF
Queue ID27INR0351
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketComanche
TechnologySolar
Capacity174.6 MW
StateTexas
CountyComanche
Point of interconnection1650 COMANCHE_T8 - 290 SHILOHC 138 kV Line
Requested (queue) date2024-09-04
Proposed in-service date
Operational date2028-09-11
Withdrawn date
DeveloperSaddle Horn Station BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata