Salem - East Windsor 500kV (H07)

Salem - East Windsor 500kV is a 200.0 MW gas interconnection project in Burlington, New Jersey with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSalem - East Windsor 500kV
Queue IDH07
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity200.0 MW
StateNew Jersey
CountyBurlington
Point of interconnection
Requested (queue) date2001-10-25
Proposed in-service date2004-06-01
Operational date
Withdrawn date2002-06-11
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata