Salka Cabazon Wind (50552_WGNS)

Salka Cabazon Wind is a 38.9 MW wind interconnection project in Riverside, California with a current status of operational.

38.9 MWCapacity
OperationalStatus
CISOMarket
WindTechnology

Project facts

Canonical nameSalka Cabazon Wind
Queue ID50552_WGNS
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyWind
Capacity38.9 MW
StateCalifornia
CountyRiverside
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1999-01-01
Withdrawn date
Developer
Utility / transmission ownerSalka Cabazon Wind LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata