Salt Fork 1 Wind (14INR0062)

Salt Fork 1 Wind is a 174.0 MW wind interconnection project with a current status of operational. It is proposed to connect at 79006 Allen Creek 345kV.

174.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameSalt Fork 1 Wind
Queue ID14INR0062
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity174.0 MW
State
County
Point of interconnection79006 Allen Creek 345kV
Requested (queue) date2013-06-04
Proposed in-service date2017-07-01
Operational date2017-06-13
Withdrawn date
DeveloperSouthern California Solar DBA Solar Electrical Systems
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.