San Bernard Solar (19INR0030)

San Bernard Solar is a 100.0 MW solar interconnection project in Wharton, Texas with a current status of suspended. It is proposed to connect at tap 138kV 43012 New Gulf - 43340 Texas Gulf Sulphur.

100.0 MWCapacity
SuspendedStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSan Bernard Solar
Queue ID19INR0030
Statussuspended
Source statussuspended
MarketERCOT
TechnologySolar
Capacity100.0 MW
StateTexas
CountyWharton
Point of interconnectiontap 138kV 43012 New Gulf - 43340 Texas Gulf Sulphur
Requested (queue) date2017-01-25
Proposed in-service date2022-01-01
Operational date
Withdrawn date
DeveloperSunchase Power
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata