SAN LUIS OBISPO SOLAR I (108A)

SAN LUIS OBISPO SOLAR I is a 300.0 MW gas interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Morro Bay - Midway 230kV line.

300.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSAN LUIS OBISPO SOLAR I
Queue ID108A
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity300.0 MW
StateCalifornia
CountyKern
Point of interconnectionMorro Bay - Midway 230kV line
Requested (queue) date2006-06-14
Proposed in-service date
Operational date
Withdrawn date2006-11-16
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata