Sand Creek 115- Switching Station (2022-G7)

Sand Creek 115- Switching Station is a 80.0 MW solar interconnection project in Weld County, Colorado with a current status of active. It is proposed to connect at Sand Creek 115- Switching Station.

80.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology

Project facts

Canonical nameSand Creek 115- Switching Station
Queue ID2022-G7
Statusactive
Source statusIA PENDING
MarketCO
TechnologySolar
Capacity80.0 MW
StateColorado
CountyWeld County
Point of interconnectionSand Creek 115- Switching Station
Requested (queue) date2022-05-26
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata