Scalp Level 23 kV IV (AG2-090 - moved to TC2)
Scalp Level 23 kV IV is a 14.0 MW solar interconnection project in Somerset, Pennsylvania with a current status of withdrawn.
14.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Scalp Level 23 kV IV |
|---|---|
| Queue ID | AG2-090 - moved to TC2 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 14.0 MW |
| State | Pennsylvania |
| County | Somerset |
| Point of interconnection | — |
| Requested (queue) date | 2021-01-26 |
| Proposed in-service date | 2027-12-01 |
| Operational date | — |
| Withdrawn date | 2025-12-02 |
| Developer | — |
| Utility / transmission owner | PENELEC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.