Scalp Level 23 kV (AF1-218)

Scalp Level 23 kV is a 15.0 MW solar interconnection project in Somerset, Pennsylvania with a current status of withdrawn.

15.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameScalp Level 23 kV
Queue IDAF1-218
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity15.0 MW
StatePennsylvania
CountySomerset
Point of interconnection
Requested (queue) date2019-09-27
Proposed in-service date2020-12-31
Operational date
Withdrawn date2019-10-17
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata