SE Athos II, LLC is a 100.0 MW battery interconnection project in Riverside, California with a current status of active.

100.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameSE Athos II, LLC
Queue ID64290_ATH1N
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketCISO
TechnologyBattery
Capacity100.0 MW
StateCalifornia
CountyRiverside
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-01-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSE Athos II, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.