SE Edinburg BESS (24INR0642)

SE Edinburg BESS is a 9.9 MW battery interconnection project in Hidalgo, Texas with a current status of active. It is proposed to connect at Southeast Edinburg, XFMR 2, #6580 CKT, SOUTHEAST EDINBURG, SE_EDINB, Ercot Bus # 8374, Ercot Load name - 138_12_2.

9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameSE Edinburg BESS
Queue ID24INR0642
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyHidalgo
Point of interconnectionSoutheast Edinburg, XFMR 2, #6580 CKT, SOUTHEAST EDINBURG, SE_EDINB, Ercot Bus # 8374, Ercot Load name - 138_12_2
Requested (queue) date
Proposed in-service date2026-04-20
Operational date
Withdrawn date
DeveloperSBESS TX10 LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata