SEARCHLIGHT 1 (126)

SEARCHLIGHT 1 is a 1,500.0 MW wind interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at Eldorado Substation 220kV bus.

1,500.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameSEARCHLIGHT 1
Queue ID126
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity1,500.0 MW
StateNevada
CountyClark
Point of interconnectionEldorado Substation 220kV bus
Requested (queue) date2006-08-31
Proposed in-service date
Operational date
Withdrawn date2012-06-12
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata