Seaway BESS (26INR0773)

Seaway BESS is a 9.9 MW other interconnection project in Waller, Texas with a current status of active. It is proposed to connect at TSP Substation Name - Seaway TSP Substation Code - Seaway Load Name/Load Transformer Name - LOAD_T-4 Bus # / PTI Bus Number: 57670 Voltage (Transmission level Kv) - 138kV Node (associated w/ load/load XFMR in NMMS) - 0009.

9.9 MWCapacity
ActiveStatus
WallerMarket
OtherTechnology

Project facts

Canonical nameSeaway BESS
Queue ID26INR0773
Statusactive
Source status—
MarketWaller
TechnologyOther
Capacity9.9 MW
StateTexas
CountyWaller
Point of interconnectionTSP Substation Name - Seaway TSP Substation Code - Seaway Load Name/Load Transformer Name - LOAD_T-4 Bus # / PTI Bus Number: 57670 Voltage (Transmission level Kv) - 138kV Node (associated w/ load/load XFMR in NMMS) - 0009
Requested (queue) date—
Proposed in-service date2027-02-22
Operational date—
Withdrawn date—
DeveloperMount Whitney Energy Storage LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30new_project—activehigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.