Senator Aggreko Solar (26INR0311)

Senator Aggreko Solar is a 251.0 MW solar interconnection project in Maverick, Texas with a current status of operational. It is proposed to connect at 138 kV Sunglow Substation (#78016).

251.0 MWCapacity
OperationalStatus
MaverickMarket
SolarTechnology

Project facts

Canonical nameSenator Aggreko Solar
Queue ID26INR0311
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketMaverick
TechnologySolar
Capacity251.0 MW
StateTexas
CountyMaverick
Point of interconnection138 kV Sunglow Substation (#78016)
Requested (queue) date2024-02-02
Proposed in-service date
Operational date2029-03-31
Withdrawn date
DeveloperSenator Aggreko Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata