Senterfitt Solar is a 68.4 MW solar interconnection project in Lampasas, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 7080 Lometa - 7064 Lampasas .

68.4 MWCapacity
OperationalStatus
LampasasMarket
SolarTechnology

Project facts

Canonical nameSenterfitt Solar
Queue ID28INR0462
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketLampasas
TechnologySolar
Capacity68.4 MW
StateTexas
CountyLampasas
Point of interconnectionTap 138 kV 7080 Lometa - 7064 Lampasas
Requested (queue) date2026-03-11
Proposed in-service date
Operational date2029-07-03
Withdrawn date
DeveloperAETS Development Holdings LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.