Lampasas County, Texas — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Lampasas, Texas, representing 2,058 MW of requested capacity.

12Total projects
0Active
11Operational
1Withdrawn
2,058 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other61,072 MW
Solar6986 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Barkley Creek Solar28INR0324Solar312.4 MWoperationalLampasas, Texas
Aurora Energy Storage28INR0277Other306.2 MWoperationalLampasas, Texas
Thomas Cameron BESS24INR0543Other201.5 MWoperationalLampasas, Texas
Seven Springs Storage26INR0489Other170.5 MWoperationalLampasas, Texas
Solgen Solar30INR0037Solar160.2 MWoperationalLampasas, Texas
Solgen Storage30INR0038Other150.3 MWoperationalLampasas, Texas
Triple B Solar Alt#224INR0069Solar150.0 MWoperationalLampasas, Texas
Blue Cut Solar21INR0254Solar150.0 MWwithdrawnLampasas, Texas
Seven Springs Solar26INR0147Solar145.0 MWoperationalLampasas, Texas
GIBSON BRANCH BESS25INR0666Other142.9 MWoperationalLampasas, Texas
Hana Springs BESS24INR0494Other100.8 MWoperationalLampasas, Texas
Senterfitt Solar28INR0462Solar68.4 MWoperationalLampasas, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lampasas County.

Start tracking with interXdata