Separator Expansion (2332)

Separator Expansion is a 12.6 MW battery interconnection project in San Bernardino, California with a current status of active. It is proposed to connect at ETIWANDA 230 kV.

12.6 MWCapacity
ActiveStatus
CAISOMarket
BatteryTechnology

Project facts

Canonical nameSeparator Expansion
Queue ID2332
Statusactive
Source statusactive
MarketCAISO
TechnologyBattery
Capacity12.6 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionETIWANDA 230 kV
Requested (queue) date2023-04-17
Proposed in-service date2025-06-06
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.