Seven Springs Solar (26INR0147)

Seven Springs Solar is a 145.0 MW solar interconnection project in Lampasas, Texas with a current status of operational. It is proposed to connect at Tap 7061 COPPERAS COVE 7260 Kempner 138kV.

145.0 MWCapacity
OperationalStatus
LampasasMarket
SolarTechnology

Project facts

Canonical nameSeven Springs Solar
Queue ID26INR0147
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketLampasas
TechnologySolar
Capacity145.0 MW
StateTexas
CountyLampasas
Point of interconnectionTap 7061 COPPERAS COVE 7260 Kempner 138kV
Requested (queue) date2023-09-22
Proposed in-service date
Operational date2028-05-26
Withdrawn date
DeveloperHancock Springs, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata