Seventy Seven Project (C24-015)

Seventy Seven Project is a 100.0 MW solar interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at High Sheldon 230 kV.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameSeventy Seven Project
Queue IDC24-015
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity100.0 MW
StateNew York
CountyWyoming
Point of interconnectionHigh Sheldon 230 kV
Requested (queue) date2024-08-01
Proposed in-service date
Operational date
Withdrawn date
DeveloperGood Ole 77 Energy LLC
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata