Shelby South (7828_1)

Shelby South is a 1.8 MW other interconnection project in Richland, Ohio with a current status of operational.

1.8 MWCapacity
OperationalStatus
PJMMarket
OtherTechnology

Project facts

Canonical nameShelby South
Queue ID7828_1
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyOther
Capacity1.8 MW
StateOhio
CountyRichland
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2000-06-01
Withdrawn date
Developer
Utility / transmission ownerCity of Shelby - (OH)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata