Richland County, Ohio — Interconnection Projects
The interXdata warehouse tracks 17 interconnection projects in Richland, Ohio, representing 727 MW of requested capacity.
17Total projects
0Active
10Operational
7Withdrawn
727 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 2 | 400 MW |
| Solar | 3 | 219 MW |
| Battery | 2 | 94 MW |
| Other | 5 | 7 MW |
| Gas | 5 | 6 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Howard 138kV | U4-001 | Wind | 200.0 MW | withdrawn | Richland, Ohio |
| Richland & Crawford | W4-021A | Wind | 200.0 MW | withdrawn | Richland, Ohio |
| Milliron-Brookside 138kV | AH1-609 | Solar | 168.3 MW | withdrawn | Richland, Ohio |
| Milliron - Brookside 138 kV II | AH2-374 | Battery | 84.0 MW | withdrawn | Richland, Ohio |
| Milliron-Brookside 138kV | AH1-608 | Solar | 49.3 MW | withdrawn | Richland, Ohio |
| Shelby BESS | 69728_SHBSS | Battery | 10.1 MW | operational | Richland, Ohio |
| Shelby Solar Array | 63390_SHBOH | Solar | 1.9 MW | operational | Richland, Ohio |
| Shelby North | 7827_1 | Other | 1.8 MW | operational | Richland, Ohio |
| Shelby South | 7828_1 | Other | 1.8 MW | operational | Richland, Ohio |
| Progress Drive Generation Station | 63457_PSG1 | Other | 1.8 MW | operational | Richland, Ohio |
| Progress Drive Generation Station | 63457_PSG2 | Other | 1.8 MW | operational | Richland, Ohio |
| Broshco Fabricated Products | 59373_3 | Gas | 1.2 MW | operational | Richland, Ohio |
| Broshco Fabricated Products | 59373_1 | Gas | 1.2 MW | operational | Richland, Ohio |
| Broshco Fabricated Products | 59373_2 | Gas | 1.2 MW | operational | Richland, Ohio |
| Broshco Fabricated Products | 59373_4 | Gas | 1.1 MW | operational | Richland, Ohio |
| MISO Queue Project G498 — Gas in Richland, Ohio | G498 | Gas | 1.1 MW | withdrawn | Richland, Ohio |
| Krendale-Seneca 138kV | X3-037 | Other | — | withdrawn | Richland, Ohio |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.