Shell Creek-Hoskins 345kv Line (GEN-2021-058)

Shell Creek-Hoskins 345kv Line is a 300.0 MW wind interconnection project in Madison, Nebraska with a current status of withdrawn. It is proposed to connect at Shell Creek-Hoskins 345kv Line.

300.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameShell Creek-Hoskins 345kv Line
Queue IDGEN-2021-058
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity300.0 MW
StateNebraska
CountyMadison
Point of interconnectionShell Creek-Hoskins 345kv Line
Requested (queue) date2021-04-29
Proposed in-service date2026-12-31
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata