SHERIDAN EHV - EL DORADO EHV 500.0kV (J2396)

SHERIDAN EHV - EL DORADO EHV 500.0kV is a 400.0 MW solar interconnection project in Calhoun, Arkansas with a current status of operational. It is proposed to connect at SHERIDAN EHV - EL DORADO EHV 500.0kV.

400.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameSHERIDAN EHV - EL DORADO EHV 500.0kV
Queue IDJ2396
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity400.0 MW
StateArkansas
CountyCalhoun
Point of interconnectionSHERIDAN EHV - EL DORADO EHV 500.0kV
Requested (queue) date2022-09-15
Proposed in-service date2025-05-31
Operational date2025-05-31
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.