Calhoun County, Arkansas — Interconnection Projects

The interXdata warehouse tracks 10 interconnection projects in Calhoun, Arkansas, representing 3,466 MW of requested capacity.

10Total projects
0Active
4Operational
6Withdrawn
3,466 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar93,266 MW
Battery1200 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
El Dorado - Sheridan 500 kVJ2785Solar500.0 MWwithdrawnCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ2395Solar500.0 MWoperationalCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ3386Solar500.0 MWwithdrawnCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ3388Solar400.0 MWwithdrawnCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ2396Solar400.0 MWoperationalCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ3711Solar400.0 MWwithdrawnCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ2640Solar394.5 MWwithdrawnCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ3567Battery200.0 MWwithdrawnCalhoun, Arkansas
SHERIDAN EHV - EL DORADO EHV 500.0kVJ2397Solar160.0 MWoperationalCalhoun, Arkansas
SR Camden59947_AEROSolar12.0 MWoperationalCalhoun, Arkansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Calhoun County.

Start tracking with interXdata