SHERIDAN EHV - EL DORADO EHV 500.0kV (J3386)

SHERIDAN EHV - EL DORADO EHV 500.0kV is a 500.0 MW solar interconnection project in Calhoun, Arkansas with a current status of withdrawn. It is proposed to connect at SHERIDAN EHV - EL DORADO EHV 500.0kV.

500.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSHERIDAN EHV - EL DORADO EHV 500.0kV
Queue IDJ3386
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity500.0 MW
StateArkansas
CountyCalhoun
Point of interconnectionSHERIDAN EHV - EL DORADO EHV 500.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-09-30
Operational date2028-09-30
Withdrawn date2025-09-26
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.