Shifting Gale Wind (19INR0175)

Shifting Gale Wind is a 289.0 MW wind interconnection project in Castro, Texas with a current status of suspended.

289.0 MWCapacity
SuspendedStatus
CastroMarket
WindTechnology

Project facts

Canonical nameShifting Gale Wind
Queue ID19INR0175
Statussuspended
Source status—
MarketCastro
TechnologyWind
Capacity289.0 MW
StateTexas
CountyCastro
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—suspendedhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.