Sidney 230 kV is a 104.0 MW solar interconnection project in Cheyenne, Nebraska with a current status of withdrawn. It is proposed to connect at Sidney 230 kV.

104.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameSidney 230 kV
Queue IDGEN-2019-042
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity104.0 MW
StateNebraska
CountyCheyenne
Point of interconnectionSidney 230 kV
Requested (queue) date2019-05-23
Proposed in-service date2024-12-31
Operational date
Withdrawn date2022-12-01
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata