Cheyenne County, Nebraska — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Cheyenne, Nebraska, representing 1,480 MW of requested capacity.

9Total projects
1Active
1Operational
7Withdrawn
1,480 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind41,048 MW
Solar5433 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Sidney (SIDNEY__-MB3) 345 kV SubstationGEN-2024-151Wind300.0 MWwithdrawnCheyenne, Nebraska
Sidney (SIDNEY__-MB3) 345 kV SubstationGEN-2024-150Wind293.6 MWwithdrawnCheyenne, Nebraska
Sidney (SIDNEY__-MB3) 345 kV SubstationGEN-2024-152Wind250.1 MWwithdrawnCheyenne, Nebraska
West Queue Project GI-0815 — Wind in Cheyenne, NebraskaGI-0815Wind204.0 MWwithdrawnCheyenne, Nebraska
Sidney Substation 230kVGEN-2016-079Solar160.0 MWwithdrawnCheyenne, Nebraska
Sidney - Stegall 230 kVGEN-2022-028Solar125.0 MWwithdrawnCheyenne, Nebraska
Sidney 230 kVGEN-2019-042Solar104.0 MWwithdrawnCheyenne, Nebraska
Sidney 115 kV SubGEN-2016-147Solar40.0 MWactiveCheyenne, Nebraska
Sidney Solar70129_GEN1Solar3.8 MWoperationalCheyenne, Nebraska

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.