Sidney Keystone 345 kV line (GEN-2019-029)

Sidney Keystone 345 kV line is a 404.0 MW wind interconnection project in Keith And Deuel, Nebraska with a current status of withdrawn. It is proposed to connect at Sidney Keystone 345 kV line.

404.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameSidney Keystone 345 kV line
Queue IDGEN-2019-029
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity404.0 MW
StateNebraska
CountyKeith And Deuel
Point of interconnectionSidney Keystone 345 kV line
Requested (queue) date2019-04-25
Proposed in-service date2024-12-31
Operational date
Withdrawn date2023-09-28
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata