Sidney (SIDNEY__-MB3) 345 kV Substation (GEN-2024-151)

Sidney (SIDNEY__-MB3) 345 kV Substation is a 300.0 MW wind interconnection project in Cheyenne, Nebraska with a current status of withdrawn. It is proposed to connect at Sidney (SIDNEY__-MB3) 345 kV Substation.

300.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameSidney (SIDNEY__-MB3) 345 kV Substation
Queue IDGEN-2024-151
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity300.0 MW
StateNebraska
CountyCheyenne
Point of interconnectionSidney (SIDNEY__-MB3) 345 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2030-12-31
Operational date
Withdrawn date2025-12-07
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata