SIENNA (1205)

SIENNA is a 66.7 MW solar+battery interconnection project in San Bernardino, California with a current status of withdrawn. It is proposed to connect at Coolwater 115kV Substation.

66.7 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameSIENNA
Queue ID1205
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity66.7 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionCoolwater 115kV Substation
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2016-03-11
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata