Silver Hills Windpower (27INR0512)

Silver Hills Windpower is a 54.0 MW other interconnection project in Howard, Texas with a current status of operational. It is proposed to connect at 10066 Prong Moss Switch 138kV.

54.0 MWCapacity
OperationalStatus
HowardMarket
OtherTechnology

Project facts

Canonical nameSilver Hills Windpower
Queue ID27INR0512
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHoward
TechnologyOther
Capacity54.0 MW
StateTexas
CountyHoward
Point of interconnection10066 Prong Moss Switch 138kV
Requested (queue) date2025-04-21
Proposed in-service date
Operational date2029-06-01
Withdrawn date
DeveloperSilver Hills Windpower, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata