Silverbell Solar (28INR0125)

Silverbell Solar is a 125.6 MW solar interconnection project in Red River, Texas with a current status of operational. It is proposed to connect at Tap 138kV Rivercrest SES 1780 - Deport REA 1768.

125.6 MWCapacity
OperationalStatus
Red RiverMarket
SolarTechnology

Project facts

Canonical nameSilverbell Solar
Queue ID28INR0125
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRed River
TechnologySolar
Capacity125.6 MW
StateTexas
CountyRed River
Point of interconnectionTap 138kV Rivercrest SES 1780 - Deport REA 1768
Requested (queue) date2024-08-16
Proposed in-service date
Operational date2028-09-30
Withdrawn date
DeveloperSilverbell Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata