Silverline Energy Center (1041)

Silverline Energy Center is a 150.0 MW other interconnection project in Tompkins, New York with a current status of withdrawn. It is proposed to connect at Miliken - Etna 115 kV lines 974 and 975.

150.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameSilverline Energy Center
Queue ID1041
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity150.0 MW
StateNew York
CountyTompkins
Point of interconnectionMiliken - Etna 115 kV lines 974 and 975
Requested (queue) date2020-06-25
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSilverline Energy Center, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.