Sisters Storage (21INR0482)

Sisters Storage is a 208.9 MW solar+battery interconnection project in Ector, Texas with a current status of active. It is proposed to connect at tapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010).

208.9 MWCapacity
ActiveStatus
ERCOTMarket
Solar+BatteryTechnology

Project facts

Canonical nameSisters Storage
Queue ID21INR0482
Statusactive
Source statusactive
MarketERCOT
TechnologySolar+Battery
Capacity208.9 MW
StateTexas
CountyEctor
Point of interconnectiontapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010)
Requested (queue) date2019-12-18
Proposed in-service date2027-05-31
Operational date
Withdrawn date
Developer174 Power Global Properties
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.